Search PHONE 1300 442 336

Quick Links

News Archive News 2009 Story

Archive News

2011

2010

2009

2008

2007

Haden Commences Work on William McCormack Cairns

05/04/2009

Haden has commenced work on the William McCormack Place Stage 2 development, an eight storey Government office building in Cairns QLD. Utilising energy efficient technologies, the building has been designed to achieve 5 star Greenstar ratings for Office Design v2, Office As-built v2 and Office interiors v1.1.

The mechanical services component includes chilled water AHU / VAV airconditioning systems and associated ventilation. Inclusive of the mechanical system is an air cooled chilled water plant and associated equipment incorporating a stratified chilled water thermal energy storage tank (TES). A rotary sorption (Hygroscopic) enthalpy heat exchanger will provide outside air pre-conditioning to meeting rooms and on-floor AHU’s and there will also be standby diesel power generator and associated equipment installed.

To assist in the management of energy use within the building, the scope includes a central BMS control system integrating all mechanical, electrical, lift, security and access systems.

Full commissioning including building pressurisation and leakage testing will be completed prior to the project's scheduled completion date of mid 2010.
 

Contact
Kelly Borskjaer
Marketing and Communications Manager


Haden Engineering Pty Limited
Int: 61 432139530
Aus:  0432139530

Print | Email